Home > Bike Components > Wheels

Lightweight Meilenstein Carbon Road Wheels Finally Get Wide, Now <1200g & Up To 7000€!

Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, outstanding in a field
24 Comments
Support us! Bikerumor may earn a small commission from affiliate links in this article. Learn More

For decades Lightweight’s carbon-spoked, made-in-Germany Meilenstein carbon wheels have always been lust-worthy for their unique looks, stiffness, and well… light weight. But only now do they finally get modern, with a 23mm tubeless internal width designed to fit the latest premium road racing tires and an updated profile for improved all-rounder aerodynamics. At yet they are still incredibly lightweight at a claimed 1190g, and still feature eye-watering price tags that push up to almost seven thousand euros!

Lightweight Meilenstein Art carbon road wheels are now wide!

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheelset
(Photos/Lightweight)

Lightweight calls this their “most advanced wheelset to date“.

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, new tubeless rim shape

On the outside, it’s the updated no longer flat-sided aero shape, the now 27% broader internal rim width, and wildly ultralight weight – 13.7% lighter than before – that really caught our attention, of course.

Aerodynamics are really a big improvement here. Lightweight designed and iterated the new Meilenstein Art wheels in CFD and then verified their improvements in the wind tunnel to reduce overall drag and especially to improve crosswind stability. Overall, it seems like a huge performance upgrade for Lightweight, after what seemed like a decade of stagnation as the rest of the wheel market advanced.

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, in the GST wind tunnel

But there’s also actually a lot more interesting tech inside that made all that possible.

What’s new?

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, new Alpha Rib Tech rim

Four years in development, the new Lightweight Meilenstein Art wheels are a big departure from the traditionally flat-sided Meilenstein that Lightweight has actually been making since 2004 (then dubbed Standard). That flat shape was an integral part of their previous unique construction, with widened extensions of their continuous rim-to-rim spokes molded into the rim walls.

Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, new Alpha Rib Tech internal reinforcement

But now, a new patented Alpha Rib Technology means that the ends of these continuous carbon spokes widen to form ribs that provide structure inside of the new blunt-nosed aerodynamic rim shape. This let Lightweight further reduce rim wall widths to save more weight, shedding 190g of the previous generation Meilenstein Evo, dropping the new Art wheels under a 1200g threshold, while improving strength and stiffness.

In between the new Alpha Ribs, Lightweight uses a new reusable core (presumably wax?) that allows them to precisely control the profile and internal surfaces. And they can fully remove the core after the wheels are cured, and reuse the material in future wheels, reducing waste.

Tech details

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, new 23mm internal rim profile
  • 45mm deep x max 28.6mm wide aero carbon rim
  • 22.9mm internal width, for 28mm and larger tires
  • hooked tubeless with uninterrupted rim bed (no need for tubeless tape)
  • Alpha Rib Tech internal structures at each spoke inside the rim to maintain stiffness & light weight
Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, continuous rim-to-rim carbon spokes
  • 20 continuous full carbon spokes tied & bonded to machined alloy hub shells front & rear
2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, Penta-Fly hub with DT internals
  • proprietary Penta-Fly alloy hubs with DT Swiss 180 Ratchet EXP freehub internals
  • centerlock disc brake only for 12mm thru-axles with tool-free end caps
  • Shimano, SRAM & Campagnolo freehubs available
  • includes tubeless valves, tire levers,
  • 120kg (265lb) max rider+bike system weight
  • 5-year warranty, plus free minor repairs for life
  • protected by individually-numbered, read-only microchip molded into each wheel
  • 1190g claimed weight +/-3% (550g front & 640g rear)

Lightweight Meilenstein Art wheels – Pricing, options & availability

Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, front with lens flare

The new raw UD carbon Lightweight Meilenstein Art wheels come in two versions – Standard or Schwarz ED.

2025 Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, white or black
Standard (l) or Schwarz ED (r)

The ‘base’ Meilenstein Art Standard wheelset sells for 6550€ with stainless steel bearings and silver decals. And the upgraded Meilenstein Art Schwarz ED wheels upgrade to low-key black graphics and CeramicSpeed bearings at the low, low price of just 6990€.

Lightweight Meilenstein Art ultralight modern aerodynamic carbon road wheels, riding

The new wider Lightweight Meilenstein carbon wheels are available now through dealer bike shops and specialized online partner retailers.

Lightweight.info

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

24 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Dave
Dave
1 year ago

Lovely. And for those of you that will complain lets be honest you are not Lightweights target customer. And I am sure they are just fine with it.

will
will
1 year ago
Reply to  Dave

whats funny is that they admitted their previous wheels sucked for years, other than being lightish they werent fast. better off getting rovals honestly.

C C
C C
1 year ago
Reply to  Dave

Agree. Few people seem to know the nature of this rim-spokes-hub “glued” design. Too expensive for most people to experience.

CHvP
CHvP
1 year ago
Reply to  Dave

Sadly, even their latest tech is still behind the curve and it took them a decade to get to this point. Behind the tech curve. Syncros and Scope are a better buy. I’ve had LW’s and they are the epitome of diminishing yield.

Oli
Oli
1 year ago

Still optimized for 25s or 26s. At least it doesn’t have the ancient V-shape front which is absolutely horrible in windy conditions.

TypeVertigo
TypeVertigo
1 year ago
Reply to  Oli

Article literally mentions these wheels being optimized for 28 mm and wider rubber.

Grillis
Grillis
1 year ago
Reply to  TypeVertigo

It literally does not say they are optimized for 28mm and wider. All it says is:

22.9mm internal width, for 28mm and larger tires

With an external width of 28.6, anything wider that 28 or 29mm is suboptimal for aerodynamics.

Brent
Brent
1 year ago
Reply to  Grillis

That is an overdue way of looking at rim’s profile. For the last 4-5 years already the 105% rules is invalid (or not needed), the latest Enve, swissside, Mavic manage larger than the rim tires

konstantinos
konstantinos
11 months ago
Reply to  Grillis

check their site man

Hape
Hape
1 year ago

My CRW (Craft Racing Wheels) in 40/45mm are 1199g. Cost 1500 EUR. So why should I buy these?

Space Raccoon
Space Raccoon
1 year ago
Reply to  Hape

The CRW have an internal rim width of 21mm – not the end of the world, but that’s probably a dealbreaker for a lot of people looking to run 28mm+ tires. Also, there’s a whole lot more to how a wheelset rides than just weight and I bet the two feel pretty different.

Grillis
Grillis
1 year ago
Reply to  Space Raccoon

My Farsports Evo S wheels are deeper at 50mm, wider at 24mm internal/30mm external, cost almost $5000 LESS, and have replaceable spokes, and still weight weight 1190g

And I wouldn’t presume the Lightweights (really a misnomer of brand name now) ride better than anything else in this category.

Hape
Hape
1 year ago
Reply to  Space Raccoon

I run my CRW with a 30mm Conti GP 5000 front + 32mm back. No problem.

Last edited 1 year ago by Hape
Evan
Evan
1 year ago
Reply to  Space Raccoon

Why would that be a deal breaker? 21mm is probably roughly ideal for 28mm tires. If you go to 25mm ID then you’re right on the cusp of what’s officially safe to run with 28s.

Eggs Benedict
Eggs Benedict
1 year ago

Those are some lovely bead hooks.

Bmx
Bmx
1 year ago
Reply to  Eggs Benedict

Not exactly symmetrical. Think the bead hook is very difficult to get perfect on a carbon rim.

Eggs Benedict
Eggs Benedict
1 year ago
Reply to  Bmx

I noticed that too, but thought it maybe had something to do with camera angle. Then again this could be a scrap wheel for just that reason.

Also, never thought about how they terminated/attached the carbon spoke at the rim. Interesting to see the attachment plate. I wonder if they put a hole in each plate to allow pressure build up to vent. So as to not have a bunch of pressurized chambers due to air temp changes.

Oli
Oli
1 year ago
Reply to  Eggs Benedict

Jesus … hadn’t noticed until I saw your comment. What a joke.

Andreas
Andreas
1 year ago

Will be interesting to read proper tests on these. My guess is Tour mag will post soon, if they don’t already have. Claim is “stiffer” but the original lightweights are already one of the stiffest around, so is it marketing speak, and in which directions are they stiffer? Also, are the freehub bodies directly swappable for other DT swiss ratchet exps? And finally, those included minor repairs would be interesting to see exemplified what they would cover. Regarding the weight, I agree, these are no longer from the halo lightest brand, but they do have legacy, experience and track record of providing products that actually work and ride OK. I would say main competitors are the likes of Partington, not the lightest wheels you can get from various Chinese companies. That in it self means that the price is related to target market segment, not mass market, hence lightweight stay on track with their existing target market and do not try to compete with light and cheap or even light and less costly. That said, from a weight perspective, are we certain that the standard version and the black series have the same weight?

blahblahblah
blahblahblah
1 year ago

to little, to late, to expensive and no longer look special

Will
Will
1 year ago

This seems to put an exclamation point on Eddie Merckx old statement “if you want to go faster, don’t BUY upgrades, RIDE up grades.”

Tom
Tom
1 year ago

sure it’s a neat wheel set. But these features (weight, stiffness, aero) have been pushed down market to wheels that cost less than $1500. I suspect that these will appeal only to those who value cachet more than actual performance improvements.

wwm
wwm
1 year ago

too little, too late and too expensive. There are so many great options on the market now.

Last edited 1 year ago by wwm
B Barber
B Barber
1 year ago

Sees article about Lightweight wheels, starts the popcorn before heading to the comments section….

Subscribe Now

Sign up to receive BikeRumor content direct to your inbox.